Satellite Subsystems

Study Guide — EEEN 567: Satellite Engineering

Department of Electrical and Electronic Engineering, Egerton University

5th Year Undergraduate • Study Guide

Learning Objectives

By the end of this study guide, the student should be able to:

  1. Identify the major subsystems of a communications satellite and explain the function of each.
  2. Distinguish between the bus (platform) subsystems and the payload, and explain how they interact.
  3. Describe the operating principles and hardware of the Attitude Determination and Control Subsystem (ADCS), power, thermal, propulsion, TT&C, and command & data handling subsystems.
  4. Perform preliminary sizing calculations for the power subsystem (solar array and battery) and analyse a simplified communication link budget.
  5. Compare attitude control actuators and thermal control techniques, selecting appropriate options for given mission constraints.
  6. Relate subsystem design trades to overall satellite mass, cost, reliability and mission lifetime.

Overview: The Satellite as a System

A communications satellite is conventionally divided into two functional blocks:

SATELLITE BUS Structure & Mechanisms ADCS (attitude & orbit) Power (arrays + batteries) Thermal control Propulsion TT&C + Command & Data Handling PAYLOAD Antennas (Rx / Tx) Low-noise receiver Frequency converters High-power amplifiers (TWTA / SSPA), channel filters GROUND SEGMENT TT&C stations • Network control Earth stations / user terminals uplink command & telemetry (TT&C) bus services RF links

Fig. 1 — Functional decomposition of a communications satellite: bus, payload and ground segment.

Design driver: every subsystem is sized by a “worst-case” scenario — eclipse for power, solstice for thermal, station-keeping propellant for lifetime, and end-of-life (EOL) conditions (degraded arrays, aged batteries) for the link budget. Designs are verified against these corner cases, not nominal conditions.
SUBSYSTEM 1 — STRUCTURE & MECHANISMS

Structural Subsystem

The structure provides the mechanical frame that carries all other subsystems through launch loads and maintains their alignment in orbit. It must survive the most violent part of the mission — launch — where quasi-static loads of 6–10 g and random vibration of tens of grms are typical.

Key Functions

Materials and Construction

Mechanisms and Deployment

SUBSYSTEM 2 — ATTITUDE DETERMINATION & CONTROL (ADCS)

Attitude Determination and Control Subsystem

The ADCS keeps the satellite pointed in the right direction — antennas toward Earth (or coverage zone), solar arrays toward the Sun — and manages the angular momentum budget of the spacecraft. Typical pointing requirements range from ±0.05° (comsat antennas) to arc-minutes (imaging).

1. Attitude Determination (sensing)

SensorPrincipleAccuracyUse
Earth horizon sensor (IR)Detects Earth's IR horizon (15 μm CO₂ band)~0.1°LEO/GEO roll & pitch
Sun sensorPhotodiode array measures Sun angle0.01–1°Safe mode, array pointing
Star trackerImages star field, matches to star catalogue1–10 arcsecHigh-accuracy 3-axis
Gyroscope (rate)Measures angular rate (mechanical / ring-laser / fibre-optic)rate, bias driftsControl feedback; dead-reckoning between updates
MagnetometerMeasures local magnetic field vector~0.5°LEO only (needs field)
GPS receiver (LEO)Carrier-phase attitude (multi-antenna)~0.1°Modern LEO buses

2. Attitude Control (actuation)

ActuatorPrincipleProsCons
Reaction / momentum wheelMotor-driven flywheel; torque by changing wheel speedPrecise, no propellantRate saturation; needs momentum dumping
Control moment gyro (CMG)Gimballed spinning rotor redirects momentum vectorHigh torque authorityComplex, heavy, costlier
Magnetic torquer (torque rod)Current loop interacts with Earth's B-fieldNo propellantWorks only in LEO; torque ⊥ B
Thrusters (cold gas / hydrazine)Expellant mass produces reaction torqueAny axis, momentum dumpingConsumes propellant; plume contamination
Gravity-gradient boomLong boom aligns with gravity gradientSimple, passiveWeak; only 2-axis; LEO
Momentum dumping:  τext = dL/dt   ⇒   dumped momentum ΔL = ∫τmag dt = ∫ (m × B) dt Environmental torques (gravity-gradient, solar radiation, aerodynamic, magnetic) build wheel momentum; periodic unloading against magnetic torquers (LEO) or thrusters (GEO) is required.

3. Typical Control Modes

Worked Example 1 — Gravity-gradient torque scale: For a comsat with inertia difference (Iy − Ix) ≈ 1,000 kg·m² at GEO, the maximum gravity-gradient torque is Tgg = (3μ/2R³)(Iy − Ix)sin2θ ≈ 7×10-6 N·m — tiny, but over a 15-year mission it accumulates wheel momentum that must be dumped weekly against magnetic torquers (LEO) or thrusters (GEO).
SUBSYSTEM 3 — ELECTRICAL POWER SYSTEM (EPS)

Power Subsystem

The EPS generates, stores, conditions and distributes electrical power. For GEO comsats the design case is eclipse (Earth's shadow, up to 72 min around equinox); for LEO it is the rapid day/night cycling (e.g., 16 eclipses/day at ~35 min each in a 400 km, 51.6° orbit).

1. Power Generation — Solar Arrays

2. Energy Storage — Batteries

3. Power Conditioning and Distribution

Battery capacity:  C = Pload × Tecl / (DOD × Vbus × ηdis) C (Ah), Pload (W), Tecl (h), Vbus (V), ηdis ≈ 0.9 discharge efficiency
Solar array sizing (EOL):  Psa = Pecl × Tecl / (Tsun × ηreg) + Pday Energy balance: the array must recharge the eclipse energy plus run daylight loads; then divide by EOL efficiency (≈0.75) and cosine off-pointing factor.
Worked Example 2 — GEO eclipse battery: Payload+bus load 5 kW, eclipse 1.2 h, bus 50 V, DOD 40%, η = 0.9.
C = 5000 × 1.2/(0.40 × 50 × 0.9) = 333 Ah → two 175 Ah NiH₂ strings for redundancy.
SUBSYSTEM 4 — THERMAL CONTROL

Thermal Control Subsystem (TCS)

In vacuum there is no convection — heat leaves only by radiation. The TCS keeps every unit within its allowable temperature range (–10 to +50 °C for most electronics; much tighter for batteries, propellant lines, and optical payloads).

1. The Governing Equation

ε σ A T4 = α S Aproj + Qinternal + Qalbedo + QIR Steady-state radiative balance: emitted IR = absorbed sunlight + internal dissipation + Earth albedo & IR (σ = 5.67×10-8 W/m²K4). At 1 AU, S ≈ 1361 W/m².

2. Passive Techniques (no power, high reliability)

3. Active Techniques (powered, used where passive is insufficient)

Worked Example 3 — Radiator sizing: A TWTA dissipates 300 W that must be rejected at 300 K with painted radiator (ε = 0.85, two-sided):
A = Q/(2εσT&sup4;) = 300/(2 × 0.85 × 5.67×10-8 × 3004) = 300/780 ≈ 0.38 m² (view factors and degradation add margin → ~0.5 m² flight).
SUBSYSTEM 5 — PROPULSION

Propulsion Subsystem

Propulsion provides the velocity increments (ΔV) for orbit raising (e.g., GTO → GEO), station-keeping, momentum dumping and end-of-life disposal. Total mission ΔV budget is a primary sizing parameter.

1. The Rocket Equation

ΔV = g0 Isp ln(m0/mf) Tsiolkovsky: g0 = 9.81 m/s², Isp (s) = specific impulse, m0/mf = initial/final mass ratio.

2. Thruster Types

TypePropellant / principleIsp (s)ThrustTypical use
Cold gasPressurised N₂/He expansion50–75mN–NMicro-sats, attitude
Monopropellant hydrazineCatalytic decomposition on Ir/Al₂O₃ bed220–2350.5–25 NStation-keeping, attitude (workhorse of comsats)
Bipropellant MMH/N₂O₄Hypergolic ignition300–34010 N–500 NOrbit raising, large manoeuvres
Solid (AKM)Composite solid grain, single burn280–300kNApogee kick motor (legacy GTO→GEO)
Electric (Hall / ion)Xenon ionised & accelerated electrostatically1,500–3,500mN–0.5 NOrbit raising & station-keeping (huge Isp → 50%+ propellant saving)
~50 m/s/yr
GEO N-S + E-W station-keeping (ΔV)
~11 m/s/yr
LEO 400 km drag makeup (solar-cycle dependent)
1,800 m/s
GTO → GEO apogee raise (chemical)
10–15 yr
Comsat lifetime limited by propellant
Electric orbit raising (EOR): replacing chemical apogee burns with Hall thrusters cuts propellant by half but raises GTO→GEO transfer time from hours to ~5 months — a classic systems trade between mass and time-to-revenue.
SUBSYSTEM 6 — TELEMETRY, TRACKING & COMMAND (TT&C)

TT&C Subsystem

TT&C is the satellite's lifeline to the ground: it reports health (telemetry), carries commands, and provides ranging for orbit determination. It must be simple, robust, and able to command the satellite even when everything else has failed.

Functions

Typical Design

Two-way Doppler: Δf = (2vr/c) f0    ⇒    vr = c Δf / (2 f0) Radial velocity from measured Doppler shift on the coherent carrier; integrated with ranging arcs for orbit determination.
SUBSYSTEM 7 — COMMUNICATION PAYLOAD (TRANSPONDER)

Communication Payload

The payload receives uplink signals, processes them (frequency conversion, amplification, channelisation) and retransmits them on the downlink. Architectures fall into two families:

Payload Chain (per channel)

StageFunctionKey device / parameter
Receive antennaCollect uplink; spatial discriminationReflector + feed; G/T = Grx − 10log Tsys
LNAAmplify weak uplink with minimal noiseHEMT/TLA; Tsys = Tant + Trx; NF < 1 dB
Down-converterShift carrier to downlink bandMixer + LO; e.g., C-band 6/4 GHz, Ku 14/12 GHz, Ka 30/20 GHz
Channel filter (IMUX/OMUX)Separate FDM channels; define bandwidth36 MHz or 72 MHz typical per transponder
HPABoost to downlink powerTWTA (60–250 W, high efficiency, linearised) or SSPA (better linearity, lower power)
Transmit antennaFocus EIRP onto coverage zoneShaped reflector; gain G = η(πD/λ)²
EIRP = Ptx + Gtx  (dBW);   C/N₀ = EIRP + (G/T)rx − Lfs − Latm + 228.6 − 10log10 B Link budget at the receive input: 228.6 = 10log(k), k = 1.38×10-23 J/K. Requirement: C/N₀ ≥ threshold + margin (≈ 1–2 dB, plus rain fade at Ku/Ka).
Worked Example 4 — Downlink C/N₀: GEO satellite EIRP 45 dBW, earth-station G/T = 30 dB/K, slant range 37,500 km, 12 GHz, clear sky.
Lfs = 20log(4πd/λ) = 20log(4π × 3.75×107/0.025) = 205.5 dB → C/N₀ = 45 + 30 − 205.5 + 228.6 = 98.1 dB·Hz — far above any modem threshold (≈ 85–90 dB·Hz); the margin (10+ dB) is what absorbs rain fade.
SUBSYSTEM 8 — COMMAND & DATA HANDLING (CDH)

Command and Data Handling (On-Board Computer)

The CDH (or OBDH) is the spacecraft's brain: a fault-tolerant processor architecture that collects telemetry, executes commands, manages the attitude control loops, handles timekeeping, and autonomously responds to anomalies.

Key Functions

Design Features

SUBSYSTEM 9 — ANTENNA SUBSYSTEM

Antenna Subsystem

Antennas provide the spatial interface between the satellite and Earth. Payload antennas must shape the beam to match the coverage zone exactly — wasting power outside the zone is directly lost revenue.

Common Antenna Types

TypeGain / beamwidthUse
Omni / helix / turnstile0–6 dBi, hemisphericalTT&C, beacon (any-attitude coverage)
Horn10–20 dBi, 20–40°Feeds for reflectors, global-beam comsats
Parabolic reflector (shaped)30–45 dBi, 0.5–2°Contoured beams: one per coverage country/region
Reflector + feed arrayMultiple shaped beams from one apertureHigh-throughput satellites (HTS): 50–200+ beams
Phased arrayElectronic beam steering, no moving partsLEO mobile (Iridium), multi-beam, agile shaping
G = η(πD/λ)²;    beamwidth ≈ 70λ/D degrees Reflector sizing: a 2 m Ku-band (14 GHz) dish → G ≈ 44 dBi, beamwidth ≈ 1.5° — small enough to reuse the same frequency in an adjacent country (frequency reuse by spatial separation).
Coverage shaping is the business model: a “contoured beam” reflector concentrates EIRP on Kenya/East Africa and suppresses spillover into the ocean; multi-beam HTS payloads reuse each band dozens of times — capacity scales roughly with the number of beams.

System Design Budgets & Interactive Calculators

Satellite design is bookkeeping: every subsystem contributes rows to a budget, and the spacecraft must close all of them simultaneously. The three master budgets are mass, power and ΔV; the payload adds the link budget.

1. Power Subsystem Sizing Calculator

Enter mission parameters to size the eclipse battery and estimate the solar array EOL power requirement.







2. Simplified Link Budget Calculator

Compute clear-sky C/N₀ for a GEO downlink and compare with a typical modem threshold.







Summary of Key Points

  1. A satellite = bus (structure, ADCS, power, thermal, propulsion, TT&C, CDH) + payload (antennas + repeater). The bus enables; the payload earns.
  2. Structure survives launch (6–10 g, vibration) and preserves alignment; CFRP gives stiffness with low thermal distortion. Deployment mechanisms are single-point-failure-critical.
  3. ADCS: sense with star trackers/horizon sensors/gyros; act with reaction wheels (precision), magnetic torquers (LEO, no propellant), thrusters (any axis). Environmental torques accumulate wheel momentum → periodic dumping.
  4. EPS: sized on the eclipse case; NiH₂/Li-ion batteries at 30–40% DOD; arrays derated for ~2–3%/yr degradation — design to EOL power.
  5. TCS: radiation-only heat rejection; passive MLI/radiators/OSRs first, heaters and louvres when passive is insufficient; α/ε ratio is the master surface parameter.
  6. Propulsion: Tsiolkovsky governs; hydrazine for station-keeping, bipropellant for orbit raising, electric propulsion for Isp > 1500 s with time penalty. Propellant usually ends the mission.
  7. TT&C: always-on lifeline; omnidirectional antennas + redundant transponders; ranging/Doppler for orbit determination.
  8. Payload: bent-pipe vs. regenerative; chain = LNA → converter → IMUX → HPA (TWTA/SSPA) → OMUX → shaped-beam antenna; link closes when C/N₀ exceeds threshold plus margin.
  9. CDH: fault-tolerant computer running control loops, command validation, FDIR autonomy and SSR storage; radiation-hardened, EDAC-protected, redundant.
  10. Master budgets (mass, power, ΔV, link) must all close simultaneously at worst-case/EOL conditions — with margin.

Review Questions

Q1. Distinguish the bus from the payload of a communications satellite, listing the subsystems that belong to each.
Show answerThe bus keeps the spacecraft alive and pointed: structure & mechanisms, ADCS, EPS, thermal, propulsion, TT&C, CDH. The payload performs the mission: receive/transmit antennas and the repeater (LNA, converters, channel filters, HPAs). Ground segment is separate: TT&C stations, control centre, user earth stations.
Q2. A reaction wheel saturates during a mission. Explain why this happens and describe two ways to recover the attitude-control authority.
Show answerConstant environmental torques (gravity-gradient, solar radiation) integrate wheel momentum to its speed limit. Recovery = momentum dumping: (1) magnetic torquers against Earth's field (LEO, propellant-free); (2) thruster firings (GEO). Both apply an external torque to transfer momentum off the spacecraft.
Q3. Size the battery for a LEO satellite: 400 W load, eclipse 35 min, bus 28 V, Li-ion DOD 30%, discharge efficiency 90%.
Show answerC = 400 × (35/60) / (0.30 × 28 × 0.9) = 233/7.56 = 30.8 Ah → specify ~35–40 Ah with margin; 16 eclipses/day implies ~6000 cycles/yr — hence low DOD for cycle life.
Q4. Why are GEO comsats designed to an “EOL power” rather than “BOL power,” and what causes the difference?
Show answerArrays degrade ~2–3%/yr from UV, particle radiation (both Van Allen transit on the way up and the on-station environment), and micrometeoroid pitting; over 15 years ≈ 25% loss. Batteries also fade. Since the mission must perform at year 15, the array is sized so that EOL power still meets the load, meaning BOL power is deliberately oversized.
Q5. Explain the physical basis of the α/ε ratio in thermal design and give typical values for a radiator and for a solar array.
Show answerα (solar absorptivity) controls heat absorbed from the Sun; ε (IR emissivity) controls heat radiated away. Radiators want low α/ε (≈ 0.1–0.3, white paint/OSR) to stay cold; solar cells need high α (≈ 0.8) to absorb light and run warm (α/ε ≈ 0.8–0.9) — which is why arrays need radiators behind them for high-power sats.
Q6. Using Tsiolkovsky, how much propellant fraction is needed for a ΔV of 1,800 m/s with a hydrazine thruster (Isp = 225 s)? With a Hall thruster (Isp = 2,000 s)?
Show answerm0/mf = exp(ΔV/(g₀Isp)): hydrazine → exp(1800/2207) = 2.26 → propellant fraction 56%; Hall → exp(1800/19620) = 1.096 → only 8.8%. This is the mass case for electric orbit raising — at the cost of months of transfer time.
Q7. Why must the TT&C subsystem remain operational with the payload switched off, and how is this achieved in practice?
Show answerTT&C is the only means to diagnose and recover the satellite; if it depended on the payload, a payload failure would be fatal. Achieved by omni antennas (link in any attitude), a separate essential power bus, redundant cross-strapped transponders, and survival heaters — safe mode assumes payload off, Sun-pointing, minimal loads.
Q8. Compare TWTA and SSPA for the high-power amplifier of a transponder channel.
Show answerTWTA: high efficiency (≈ 60–70% at saturation), high power (100–250 W), mature; but needs high-voltage supplies, is bulky and less linear (needs linearisers/operating back-off). SSPA (GaN): excellent linearity, instant on, lower voltage, rugged; lower per-device power and efficiency at very high power — chosen for multi-carrier linearity, TWTAs for raw downlink power economics.
Q9. A contoured-beam antenna covers East Africa; the operator wants to add capacity. Explain two payload-level options and their trade-offs.
Show answer(1) Add transponder channels (wider bandwidth) — limited by spectrum filings and power; (2) move to a multi-beam/HTS payload — many narrow beams reuse the same frequencies N times and concentrate EIRP, multiplying capacity per Hz; costs: more HPAs/feeds or a phased array, higher DC power (EPS grows), and complex beam-forming on board.
Q10. State the role of FDIR in the CDH and give a typical escalation sequence.
Show answerFDIR = Fault Detection, Isolation, Recovery: the autonomy layer that keeps the satellite safe without ground contact. Typical escalation: (1) detect out-of-limit telemetry / watchdog; (2) retry or switch to redundant unit (isolation); (3) reconfigure loads / safing (payload off, arrays Sun-pointed); (4) persist → safe mode with beacon + omni TT&C, awaiting ground commanding; critical events (imminent collision, power crisis) may trigger immediate safe mode.

References and Further Reading